Insulation brick construction process

2016-11-15 08:48:13
 1, insulation bricks before clamping should first make insulation bricks in a stable position to be caught in the jaws clamp insulation brick center line. 
2, remove and place for insulation tiles should be smooth and free of debris. When the insulation bricks in place, should be insulated bricks put stability before they release the clamp. When insulation tiles lifting hooks must not stand on the bottom or other operations insulation bricks. 
3, insulation brick construction, the body may not be standing masonry wall, crossed other operations. When using the scaffolding, safety nets should be set up around the house facades, and with the construction of a gradual ascending height; layer of safety net under the eaves, the project is not completed before the roof must not be removed.
4, has been in place Silica Hot Repair and Mortar , filling vertical joints must be carried out immediately, the window between the poor stability of walls, columns and pick the wall more independent parts of the external walls of fire insulation materials, should be added to the temporary stable support. 
5, the insulation brick brick, not wind cable pulling rope, not hanging heavy objects should not be implemented as other temporary construction and support of the anchor if it proves necessary in the masonry, construction should take effective measures to concrete insulation bricks. 
6, mortar pump before use, should be checked. When operating, the pressure should be required to carry out, and wear protective labor supplies.
Company: Henan Hongtai Kiln Refractory Co., Ltd.
Add: Chaohua town, Xinmi city, Henan
Tel: +86-18623801271
Fax: +86-18623801271
Email: [email protected]
Please specify a valid email address.
your Name